Construction of 4 Lane with PS Idar-Badoli bypass section from Design km 81/300 to km 95/500 of NH 168-G in the State of Gujarat (Total length 14.200 km) on EPC mode.
Construction of 4 Lane with PS Idar-Badoli bypass section from Design km 81/300 to km 95/500 of NH 168-G in the State of Gujarat (Total length 14.200 km) on EPC mode. at New Delhi,Delhi,India
Classified in :
#Road
Key Values
Worth | : | ₹ 4268000000.0 |
EMD | : | ₹ 42700000.0 |
Doc Fees | : | ₹ 50000.0 |
Key Date
Due on | : | 08-Oct-2025 |
Days to go | : | -7 Days |
Opening on | : | 09-Oct-2025 |
Published on | : | 18-Jul-2025 |
Key Location
Location | : | New Delhi,Delhi,India |
Address | : |
![]() |