Proposed construction of 2 lane ROB along with subway (1x4.0 x2.50m RCC Box) in lieu of LC N.33 at Km 59/800-900 with 1x30m composite girder ( Railway Portion) +04x18.71m PSC Girder towards PB NH side and 2x18.71 PSC girder towards Panditahanahali side and retaining wall on both sides of ROB merging lengths between Kyathasandra and Hirehalli stations including electrical works. ( Composite work). at Hirehalli,Karnataka,India
Classified in :
#Wall
#Electrical Work
#Bridge
#Tunnel Work
#Girder
Key Values
Worth | : | 173813348.98 |
EMD | : | 1019100.0 |
Doc Fees | : | Refer Document |
Key Date
Due on | : | 28-Aug-2025 |
Days to go | : | -15 Days |
Opening on | : | 28-Aug-2025 |
Published on | : | 05-Aug-2025 |
Key Location
Location | : | Hirehalli,Karnataka,India |
Address | : |
![]() |